Playbuilder projects

Year 1 Play Areas:

Lewesdon Drive
Beamish Road
Sherborn Crescent
Gough Crescent
Dawkins Road
Foreland Road
Turlin Moor Pavilion
Haskells Rec
Uppleby Road
Oakdale Park
Alexandra Park
Consultation Summary

Year 2 Play Areas

Other Play Areas

Uppleby Road Play Area

Uppleby Road, Upper Parkstone, Poole

Year 1 Playbuilder (2009/2010)

Total cost:

£49,000 as at 08.03.10*

Project Officer:

Sarah Austin

Consultation:

How, who and what was said

Landscape Architect:

Hilary Martin Integrated Design

Installation:

Banyards of Wimborne

Newtown Ward Councillors:

www.boroughofpoole.com

Links to CYPS pages, BoP website


  • OFFICIALLY OPENED by the Mayor of Poole, Councillor Charles Meachin, on Friday 9th April 2010

Work started on this improvement project on 7th December, but the weather was against us, bringing frozen ground that became deep mud when it thawed.

We were finally able to level and seed the damaged areas on 3rd February and re-opened the play area three days later.

In addition to providing a good range of new play equipment, the old equipment has been re-painted, the old rubber surfacing cleaned, and the old black railings repainted a vibrant blue.

Much of the new play equipment is set into what is called 'grassmat'; grass will eventually grow through it to retain the natural look of the space.  The mat prevents wear-and-tear and provides a softer landing for falls.

A new litter bin will be installed March/April.

Progress in pictures - click on any image below to enlarge it:

Behind the old swing frame, the new Cone Climber

The old climbing frame has been repainted

The new Aerospeed

Buddy Swing (where the old Cabin Slide once stood)

The Gyrospiral (spinning seesaw)

One of two picnic tables installed

10th Dec, the old Cabin Slide has gone, removed from a very muddy site!

10th Dec, the old roundabout has gone too, we're installing a new spinning Cone Climber in its place

 

Play designs were drawn up by Landscape Architect Hilary Martin based around the wishes expressed by young people and play area users during the consultation.  They include some improvements for the under 8s:

click to open play design (PDF 750kb)

click to download play design PDF (750kb)

Uppleby Road play area

Click on images to enlarge them

 

 

 

The Department for Education was formed by the new government on 12 May 2010 and is now responsible for children's services.

www.leisureprojects.net

Site compiled for information purposes only.  Please direct any questions or comments to Sarah Austin, Project Officer

© 2010 Borough of Poole Leisure Services, Northmead House, 30-32 Northmead Drive, Creekmoor, Poole BH17 7RP