Beamish Road Play Area

Beamish Road, Canford Heath
 

Year 1 Playbuilder (2009/2010)

Total cost:

£59,200 as at 08.03.10

Project Officer:

Sarah Austin

Consultation:

How, who and what was said

Installation:

Continental Landscapes, Poole

Canford Heath East Ward Councillors:

www.boroughofpoole.com

Links to CYPS pages, BoP website


  • OFFICIALLY OPENED by the Mayor of Poole, Councillor Charles Meachin, on Monday 15th February 2010

Four new pieces of equipment have been installed, three in the original play area for 8-13 yr olds - a Cone Climber, Buddy Swing, Gyrospiral (a bouncy spinning see-saw) and, in the grass on the other side of the footpath, a 30m long Aerial Cableway.

Older equipment has been given a coat of paint, and we have removed several yellow "swing barriers" (they were unnecessary); barriers behind the swings remain to help protect users from ball games.  Of the original equipment, only the old 'Buckabout' was removed.

The improved play area re-opened 23rd December.  In March we will be back to install new seating and a litter bin.

Progress in pictures (click on any image below to enlarge it):

15th Feb; the Mayor and the new play area sign

15th Feb; the Mayor with local resident Mrs Mark and her children at the aerial cableway

11th Feb; the invitation goes out for the official opening on Monday

15th Feb; the Mayor of Poole officially opens the new play area

8th Jan, the improved play area, incl Gyrospiral seesaw & Cone Climber

8th Jan, the new Buddy Swing

16th Dec, repairing the old rubber surfacing

8th Jan, the new Aerial Cableway

14th Dec, base for new rubber surfacing below the repainted climbing frame

14th Dec, the timber Aerial Cableway is installed in grass opposite the main play space

8th Dec, the Buddy Swing awaiting new surfacing

8th Dec, repainting the older equipment

27th Nov, the Buddy Swing frame is installed

8th Dec, poles for the Gyrospiral & Cone Climber awaiting new surfacing

24th & 25th Nov, no working on site - it was simply too wet!

18th Nov, old equipment & surfacing broken out

18th Nov, digging out space for the new Cone Climber and its surfacing

click to download play design PDF (1MB)

Ideas were drawn up in August based around the wishes expressed by young people. and work started on site on Monday 16th November.  We expected the project to take 3 weeks but unfortunately the site became so wet and boggy that everything took a lot longer than normal.

Beamish Road play area

Click to enlarge image above

Beamish Road Play Area

 

 

 

 

The Department for Education was formed by the new government on 12 May 2010 and is now responsible for children's services.